Saeid Shakeri
PROJECT MANAGER, GB CONSTRUCTION, INC.
PROFILE
As an experienced Project Manager, Saeid controls and maintains the master schedule, project budget and quality of construction projects ranging from from residential and commercial to industrial buildings and schools. He is well-versed in ensuring all legal requirements, building and safety codes, safety codes, safety inspections, city guidelines, local, state and federal regulations are always adhered to. Knowledgeable about public work labor compliance requirements, Saeid is organized, efficient and effective in providing support and guidance to in-house personnel, sub-contractors and clients.
RECENT PROJECTS
Verizon TI project (5 buildings, open office, office rooms, gym) Irvine, CA – 2013 to 2015
• Total Construction: $8 Million
Luxury Apartment Building (18 stories, post tension, parking structure, retail) Koreatown, CA – 2015 to 2015
Cal State Long Beach Data Center Retrofit (HVAC, generator, transformer) – 2015
• Total Construction: $3 Million
36-Unit Low Income Housing (wood framing, parking, podium) Fullerton, CA – 2016 to 2018
• Total Construction: $10 million
PROFESSIONAL EXPERIENCE
-
2021 – Present Project Manager GB Construction, Inc.
-
Jan 2018 – 2021 Self-Employed (Design-Build)
-
Dec 2016 – Jan 2018 Project Engineer Optimus Construction
-
Jan 2014 – Dec 2016 Project Engineer & BIM Engineer Swinerton Builders, Inc.
CERTIFICATIONS
-
California PE License
-
California General Contractor License Class A & B, PMP
EDUCATION
-
2013 California Polytechnics University, Pomona
-
M.S. of Civil Engineering
-
-
2009 University of Nevada, Reno
-
B.S. of Civil Engineering
-