Saeid Shakeri

PROJECT MANAGER, GB CONSTRUCTION, INC.

PROFILE

As an experienced Project Manager, Saeid controls and maintains the master schedule, project budget and quality of construction projects ranging from from residential and commercial to industrial buildings and schools. He is well-versed in ensuring all legal requirements, building and safety codes, safety codes, safety inspections, city guidelines, local, state and federal regulations are always adhered to. Knowledgeable about public work labor compliance requirements, Saeid is organized, efficient and effective in providing support and guidance to in-house personnel, sub-contractors and clients.


RECENT PROJECTS

Verizon TI project (5 buildings, open office, office rooms, gym) Irvine, CA – 2013 to 2015
  • Total Construction: $8 Million

Luxury Apartment Building (18 stories, post tension, parking structure, retail) Koreatown, CA – 2015 to 2015
       
Cal State Long Beach Data Center Retrofit (HVAC, generator, transformer) – 2015
  • Total Construction: $3 Million

36-Unit Low Income Housing (wood framing, parking, podium) Fullerton, CA – 2016 to 2018
  • Total Construction: $10 million

PROFESSIONAL EXPERIENCE

  • 2021 – Present            Project Manager                              GB Construction, Inc.

  • Jan 2018 – 2021          Self-Employed (Design-Build)

  • Dec 2016 – Jan 2018  Project Engineer                              Optimus Construction

  • Jan 2014 – Dec 2016  Project Engineer & BIM Engineer  Swinerton Builders, Inc.
         

CERTIFICATIONS

  • California PE License

  • California General Contractor License     Class A & B, PMP

EDUCATION

  • 2013  California Polytechnics University, Pomona

    • M.S. of Civil Engineering

  • 2009  University of Nevada, Reno

    • B.S. of Civil Engineering

Shakeri, Saeid.jpg