top of page

SCHOOLS

BOLSA GRANDE HIGH SCHOOL STADIUM 

GARDEN GROVE, CA

Bolsa Grande High School Stadium Project stands as a testament to resilience, determination, and exceptional craftsmanship. Completed amidst one of the most challenging weather conditions in recent history, our team faced over four months of relentless historical rainfalls, yet remained committed to delivering a state-of-the-art athletic facility that exceeds expectations.

Funded by bond measures dedicated to enhancing educational facilities, this project was made possible through the strong support of the community and stakeholders who believe in investing in the future of student athletics.

Despite the adverse conditions, we successfully constructed a modern stadium designed to support a wide range of athletic events and foster school spirit. The project features a high-quality synthetic turf field, an all-weather track, upgraded bleachers, advanced LED lighting systems, and comprehensive ADA-compliant accessibility improvements.

This stadium not only serves as a premier sports venue but also symbolizes the perseverance and dedication of our team. Through meticulous planning, adaptive project management, and unwavering teamwork, we overcame every obstacle to create a facility that will inspire generations of students and athletes.

Bolsa Grande High School Stadium Project reflects our commitment to excellence, innovation, and the enduring spirit of the communities we serve.

■  PROJECT OWNER:

Garden Grove Unified School District ​

■ TIMING:

Original Completion Date August 17, 2019 

Completion Date August 17, 2019 

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

Senior Project Manager: Michael Lesher

Project Manager: Tillie Levin Superintendent: Peter “Chip” Lanzi Project Engineer: Jun Lee 

Project Architect Name: 

Ghataode Bannon Architects

Original Contract Value: $9,106,369 Total Contract Value: $11,014,714 

LOS AMIGOS TRACK AND FIELD REPLACEMENT PROJECT

FOUNTAIN VALLEY, CA

Completed between 2021 and 2022, Los Amigos Athletic Field project was a significant enhancement for Los Amigos High School under the Garden Grove Unified School District. This state-of-the-art athletic facility was designed to promote student athletics and community engagement.

The project featured the construction of a nine-lane, all-weather synthetic track and field, complemented by long jump and triple jump pits to support a range of athletic activities. Additionally, new LED lighting was installed to improve visibility and energy efficiency, while five-tier aluminum bleachers provide ample seating for spectators.

Further enhancements included athletic equipment and accessories, improved fencing, dedicated storage facilities, and ADA-compliant upgrades to ensure accessibility for all. This project was partially funded by Measure P, a $311 million bond measure approved by voters in 2016, reflecting the district's commitment to fostering high-quality educational and recreational environments.

■  PROJECT OWNER:

Garden Grove Unified School District ​

■ TIMING:

Original Completion Date August 01, 2023

Completion Date August 01, 2023

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

Project manager : Dallas Moon Superintendent :Peter Lanzi

Project Engineer: Nick Dillingham

Project Architect Name: 

Original Contract Value: $2,688,282 

Final Contract Value: $3,574,125 

ALAMITOS INTERMEDIATE , RALSTON INTERMEDIATE & WALTON INTERMEDIATE SCHOOLS MODERNIZATION  

GARDEN GROVE, CA

Walton, Alamitos, and Ralston Intermediate Schools Modernization and HVAC Upgrade project was completed under a single contract as part of the Garden Grove Unified School District's (GGUSD) commitment to enhancing educational facilities. This project was funded by Measure A, a $250 million bond measure approved by voters in 2010.

Completed in 2015, the project included comprehensive infrastructure upgrades across all three campuses. Key improvements involved the installation of new heating, ventilation, and air conditioning (HVAC) systems to ensure optimal climate control and energy efficiency. Additional enhancements included the replacement of dual-pane windows, improved insulation, new ceilings, and the installation of energy-efficient LED lighting to create more comfortable and conducive learning environments.

■  PROJECT OWNER:

Garden Grove Unified School District 

■ TIMING:

Original Completion Date January 28, 2017 

Completion Date March 31, 2018 

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

 Project Manager: KC Kim Superintendent: Michael Roberts

Project Engineer: Joon Kang

Project Architect Name:

Westgroup Designs, Dave Duff

Original Contract Value: $15,788,255.00 

Total Contract Value:

$18,831,377.00 

MONROE ELEMENTARY SCHOOL HVAC UPGRADE 

FOUNTAIN VALLEY, CA  

Monroe Elementary School Modernization and HVAC Upgrade project was part of the Garden Grove Unified School District's (GGUSD) comprehensive efforts to provide safe, modern, and comfortable learning environments. This project was funded by Measure A, a $250 million bond measure approved by voters in 2010.

As part of this initiative, new heating, ventilation, and air conditioning (HVAC) systems were installed, ensuring that all classrooms are fully air-conditioned to support an optimal learning atmosphere. The modernization efforts also included a range of infrastructure improvements designed to enhance the overall functionality and safety of the school.

These upgrades reflect GGUSD's ongoing commitment to maintaining high-quality educational facilities that promote student well-being, safety, and academic success.

■  PROJECT OWNER:

Garden Grove Unified School District  

■ TIMING:

Original Completion Date: August 2023 

Date Completed: August 2023 

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

Project Architect Name:

Ghataode Bannon Architects 

Original Contract Value: $2,794,525.00 

Final Contract Value: $3,176,715.81 

 Project Manager: Dallas Moon

Superintendent: Michael Roberts

Project Engineer: Nick Dillingham

MURDY ELEMENTARY SCHOOL MODERNIZATION & HVAC  

FOUNTAIN VALLEY, CA  

Murdy Elementary School Modernization and HVAC Upgrade project was part of the Garden Grove Unified School District's (GGUSD) district-wide initiative to enhance educational facilities. Completed in 2015, this project was funded by Measure A, a $250 million bond measure approved by voters in 2010.

The project included comprehensive infrastructure improvements, such as upgrades to electrical circuitry, plumbing, lighting, roofing, intercom and fire-safety systems, as well as the renovation of playground equipment to create a safer and more engaging environment for students.

Additionally, outdated heating and ventilation systems were replaced with modern HVAC systems to improve energy efficiency and ensure a comfortable learning environment for both students and staff.

These enhancements reflect GGUSD's ongoing commitment to providing high-quality educational environments that promote student success, well-being, and safety.

■  PROJECT OWNER:

Garden Grove Unified School District

■ TIMING:

Original Completion Date: August 2023 

Date Completed: August 2023 

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

.

Project Architect Name:

Original Contract Value:  

Final Contract Value: 

NORTHCUTT ELEMENTARY SCHOOL HVAC UPGRADE 

FOUNTAIN VALLEY, CA  

Northcutt Elementary School Modernization and HVAC Upgrade project was part of the Garden Grove Unified School District's (GGUSD) ongoing efforts to provide safe, comfortable, and modern learning environments for students and staff.

This comprehensive project focused on upgrading the school's infrastructure, including the installation of new heating, ventilation, and air conditioning (HVAC) systems to enhance indoor air quality and climate control throughout the campus. The modernization work also included improvements to classrooms and other facilities, ensuring they meet contemporary educational standards.

Funded by Measure A, a $250 million bond measure approved by voters in 2010, this project reflects GGUSD's commitment to maintaining high-quality educational environments. The upgrades at Northcutt Elementary are part of a district-wide initiative aimed at repairing and replacing essential infrastructure, promoting student well-being, and supporting academic success.

■  PROJECT OWNER:

Garden Grove Unified School District  

■ TIMING:

Original Completion Date: August 2023 

Date Completed: August 2023 

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

.

Project Architect Name:

Ghataode Bannon Architects 

Original Contract Value: $1,815,564.98 

Final Contract Value: $2,386,798.05 

WAKEHAM ELEMENTARY SCHOOL MODERNIZATION & HVAC  

FOUNTAIN VALLEY, CA  

Wakeham Elementary School Modernization and HVAC Upgrade project was part of the Garden Grove Unified School District's (GGUSD) broader efforts to enhance educational facilities district-wide. Funded by Measure P, a $311 million bond measure approved by voters in 2016, this project aimed to create a safer, more comfortable, and modern learning environment for students and staff.

Completed in 2017, the project included the installation of new heating, ventilation, and air conditioning (HVAC) systems, ensuring all classrooms are fully air-conditioned to support a conducive learning atmosphere. Additionally, the modernization encompassed comprehensive infrastructure improvements, including upgrades to electrical circuitry, plumbing, lighting, roofing, intercom and fire-safety systems, and the renovation of playground equipment.

These enhancements reflect GGUSD's commitment to maintaining high-quality educational environments that promote student well-being, safety, and academic success.

■  PROJECT OWNER:

Garden Grove Unified School District

■ TIMING:

.

 GB TEAM 
 PROJECT DESIGNER 
CONTRACT VALUE 

Project Architect Name:

Ghataode Bannon Architects 

bottom of page